Skip to main content
All tasks and the columns of every file
Codebook

Delay Discounting: the columns of the class CSV

Task version 1.0. In the file, the column task reads delay_discounting.

Each description belongs to a task version. A new version of a task can change what a column means, so compare the task_version column of your file with the version named on the task's page.

Columns of every file, for this task

The overview explains the columns of every file. For this task:

  • With the default settings, each student is assigned at random to one level of each factor. The file has one column per factor:
    • assigned_immediateSide: left, right
  • For this task the reveal does not close the data collection, so the file has no after_reveal column.
  • For this task, material_language takes one of these values: zxx.

Summary columns

The task's own values, in this order, between material_language and the quality_ columns. They are computed on the student's device when the run ends.

12 of 12 summary columns described

  • decisionsnumber · count

    Number of decisions between 500 euros now and 1000 euros later that count, at most 5. The answers are sent after the fifth decision, so a submitted run has 5.

  • ed50Stagenumber

    The outcome of the five adjusting decisions, a whole number from 1 to 32 on the fixed list of 31 delays from 1 hour to 25 years: outcome r lies between the delays r minus 1 and r of the list; 1 is below the shortest delay (1 hour), 32 above the longest (25 years). Higher: the later amount kept its worth over longer delays. It follows from the delay of the fifth decision and its choice. Empty with fewer than 5 decisions.

  • ed50Daysnumber

    The equivalence delay (ED50) in days: the geometric mean of the two delays that bracket the outcome; at outcome 1 the shortest delay itself (1 hour, 0.0416667), at outcome 32 the longest (25 years, 9131.25). Months count 365.25/12 days, years 365.25 days. Six significant digits. Empty with fewer than 5 decisions.

  • kPerDaynumber

    Hyperbolic discount rate per day, 1 divided by the unrounded ED50 in days, four significant digits. Higher: stronger discounting of the later amount. Empty with fewer than 5 decisions.

  • lowerDelayDaysnumber

    The shorter of the two delays that bracket the outcome, in days, six significant digits. Empty at outcome 1 (below the shortest delay) and with fewer than 5 decisions.

  • upperDelayDaysnumber

    The longer of the two delays, in days, six significant digits. Empty at outcome 32 (above the longest delay) and with fewer than 5 decisions.

  • boundarytext

    "lower" at outcome 1 (the equivalence delay lies below 1 hour, the limit of the scale), "upper" at outcome 32 (above 25 years); empty for every other outcome and with fewer than 5 decisions.

  • laterChoicesnumber · count

    Number of decisions in which the 1000 euros later were chosen, 0 to 5.

  • firstChoiceLaterPctnumber · percent

    100 when the later amount was chosen in the first decision (a delay of 3 weeks, the same for everyone), 0 when the 500 euros now were chosen; empty without any decision. The mean over the rows is the share of the class choosing later at 3 weeks.

  • atBoundaryPctnumber · percent

    100 when the outcome lies at a limit of the scale (boundary "lower" or "upper"), else 0; empty with fewer than 5 decisions.

  • immediateSidetext

    Where the card with the 500 euros now stood, the same in all five decisions: "left" or "right" (on a narrow phone screen the cards are stacked, and "left" is the upper one). Assigned by the server; drawn on the device only without a valid assignment. Empty without any decision.

  • medianDecisionMsnumber · milliseconds

    Median time per decision, from the two cards appearing to "Confirm choice", over the five decisions, whole milliseconds. There is no time limit. Empty with fewer than 5 decisions.

Settings columns

This task has no settings, so the file has no setting_ columns.